It's been six years since Orange Research Inc. began employing lean methods meant to remove inefficiencies. This meant physical changes to the layout of the manufacturing floor – creating work cells making a whole product, instead of scattered assembly stations that wasted time.
Read the full article from the Connecticut Post newspaper by clicking on the link below:
http://www.connpost.com/ci_12195049