Beware the slippery slope along the lean manufacturing path

Mike Wroblewski, Batesville Casket Company; lean sensei, Batesville Casket Company

In Lean 101, the lean approach is concisely stated as the elimination of waste in our processes. While waste elimination gets to the core of the lean approach, it is just one key aspect within the lean journey. The most notable result of waste elimination is cost reduction. If asked, cost reduction easily jumps to the top of any upper management’s list of major benefits in following the lean approach.

http://4.bp.blogspot.com/_OPu--EUUVfY/SNKNAt5F58I/AAAAAAAAAHY/JqPdBn3zDxU/s320/slippery+slope.bmp

But somewhere on the lean path, we can start to slide down the slippery slope and fall off the path. Our cost reductions turns to cost cutting and we quickly fall into the mode of cutting corners. Delay a machine repair. Reduce or eliminate our Total Productive Maintenance program. Cut back on building maintenance. Let racks and fixture degrade. Forget the daily 5-S, just make more products. Cut a little more and cut a little deeper (Why not? We are still pushing out our products, right?).

At first, everything looks great at the bottom line, but that is just a short-term benefit. It doesn’t take much time until the destructive nature of cutting corners starts to make its presence known.

All of our previous gains suddenly evaporate. Overtime goes up, machine breakdowns increase, deliveries are missed and quality problems are popping up all over the place. Chaos reigns. “We must regain control,” goes the talk around the plant. “It’s time to drop this lean approach and jump into our past-proven, all-hands-on-deck firefighting mode.

Here is a simple example of cutting corners. Most of us drive cars, and it is recommended that we change our oil every 3,000 miles. At a cost of about $35 to get our oil changed and estimating our typical annual mileage at 20,000 miles, it costs us $210 a year.

But, what if we only change our oil every 6,000 miles? Our costs are cut in half. But, what if we go 12,000 miles before we change our oil? We can save 75 percent off our annual oil change cost!

But, are we really saving anything in the long run? Factor in the reduced life of our car, increased downtime and repair bills to come and we learn first-hand what is meant by the old saying “pay me now or pay me later.” The “pay me later” method ends up costing us more; sometimes a lot more. We now can begin to see that our cutting-corners approach is not a good approach from a total-cost standpoint in the long run.

As we look to our own lean journey and at the “improvements” within our own organizations, are we focused on reducing wastes or are we really just cutting corners?

About the author:
Mike Wroblewski started his lean journey with instruction in quick die change from Shigeo Shingo. Mike is currently the lean sensei at Batesville Casket Company in Batesville, Ind. He also writes a blog called “Got Boondoggle?” featuring lean and Six Sigma topics. Check it out at http://gotboondoggle.blogspot.com/.