Lean vs. material requirement planning

RP news wires, Noria Corporation
Tags: lean manufacturing

Both lean manufacturing and material requiring planning (MRP) are equally popular concepts. Both have saved tons of money to the followers. But these two concepts have some fundamental differences as well. MRP works at achieving best with what we have currently; lean works at removing the root cause of the problem. Both lean and MRP can be used hand-in-hand to achieve good results. To read more, visit http://www.learnleanblog.com.

Access this 1-minute, 51-second video by clicking on the link below.